Minimization of the program’s total duration in flowshop production systems, without interruption in task execution

Authors

  • Fábio José Ceron Branco
  • Marcelo Seido Nagano
  • João Vitor Moccellin

DOI:

https://doi.org/10.15675/gepros.v0i2.304

Abstract

This paper addresses the m-machine no-wait flow shop scheduling problem to minimize makespan. The new method is compared with other improvement strategies reported in the literature. Experimental results show that the new heuristic provides better solutions regarding both solution quality and computational effort. Keywords: heuristics methods, no-wait flowshop, Makespan.